The ongoing management of emergency lighting infrastructure can be a laborious and costly business.
Manuel test compliance requires a technician to attend site to physically check each Emergency Luminaire for initial operational compliance followed by the manual disconnection of the mains power and a 90 min wait to access AS2293 compliance. 
 
    
It is only when we recognise all associated costs required to keep a building fully operational is when it becomes clear that there has to be a more practical solution than following current practice.  

WELLS

EMERGENCY

WIRELESS EMERGENCY LIGHTING SOLUTION

Suprema 3.jpg
WELLS_Controller_-_Angle_Photo-removebg-
Helix No Shadow.png
Azura 4 Ft Batten.png
pdf dOWNLOAD.png
Download
Specification Sheet